A diversified portfolio across the energy value chain.

LNG & gas infrastructure, power, renewables and energy solutions designed for resilience and long-term value.

Portfolio DIVERSIFIED LNG & Gas 43% Power 25% Renewables 19% Solutions 13% TARGET PORTFOLIO MIX — DEVELOPMENT STAGE

LNG & Gas Infrastructure

Teilchen Energie is advancing two complementary gas development opportunities within Venezuela’s Mariscal Sucre complex — the Río Caribe and Mejillones offshore gas fields. Proposals have been submitted to PDVSA and the Ministerio del Poder Popular de Hidrocarburos. No award, concession or licence has been granted. Because PDVSA is subject to US sanctions, any transaction requires authorisation from OFAC at the Treasury before it can proceed; LNG export authorisation is a separate matter for the Department of Energy at a later stage.

Developed together, these assets would form an integrated LNG value chain — from upstream offshore production on Venezuela’s Península de Paria through to LNG export and regional delivery. We are pursuing a phased development approach designed to attract institutional capital and strategic partners at the project level.

2

Offshore gas fields, proposals filed

3

Regulatory approvals required before development

UPSTREAM Offshore Gas Fields PROCESSING Liquefaction & Treatment LNG EXPORT Terminal & Loading LNG CARRIER FIELD PIPELINE TERMINAL LOADING
LNG terminal with storage tanks and carrier vessel at berth
Future LNG Terminal & Carrier Fully integrated export capability — target from first operations

Power Generation

Teilchen Energie’s power generation strategy is built around a gas-to-power model, converting domestic gas supply into reliable, competitively priced electricity for industrial and municipal markets. The Península de Paria development in eastern Venezuela is our anchor opportunity — a prolific offshore gas region with proven reserves and proximity to Atlantic LNG export routes.

Our target configuration centres on combined-cycle gas turbine (CCGT) technology, which delivers the efficiency, dispatchability and emissions profile required for long-term offtake contracts with creditworthy counterparties.

CCGT

Target generation technology

Venezuela

Primary development location — Paria Peninsula

GAS SUPPLY COMPRESSOR COMBUSTOR GAS TURBINE GEN ① exhaust heat HRSG Heat Recovery STEAM TURBINE GEN ② GRID OUTPUT Thermal efficiency ~60% vs. 35% simple cycle Emissions intensity ~350 g CO₂/kWh target — vs coal 850+ Condenser → cooling tower → feedwater loop CCGT COMBINED-CYCLE GAS TURBINE — TARGET CONFIGURATION

Geothermal & Renewables

Our renewables platform is anchored by a proposed 250 MW Enhanced Geothermal System (EGS) in the Permian Basin of West Texas — one of the most prospective geothermal regions in North America, with high subsurface temperatures and established drilling infrastructure carried over from the oil and gas industry.

EGS geothermal delivers firm, 24/7 baseload power with no fuel cost and a minimal surface footprint — a fundamentally different profile from solar or wind. We are advancing this project alongside our LNG and gas infrastructure assets as part of a diversified, low-carbon energy platform.

250 MW

Target EGS geothermal capacity — West Texas

24/7

Firm baseload power — no intermittency

0 m 2 km 4 km 6 km SURFACE POWER PLANT 250 MW target INJECTOR PRODUCER cold water ↓ hot fluid ↑ sedimentary / basement hot dry rock / granite ≥200 °C STIMULATED ROCK VOLUME TEMP HOT ENHANCED GEOTHERMAL SYSTEM — PECOS BASIN, WEST TEXAS

Energy Solutions

As our asset base matures, Teilchen Energie intends to build an integrated energy services platform spanning digital efficiency, demand-response and carbon management — serving the industrial, commercial and municipal customers connected to our generation and infrastructure assets.

Our long-term vision includes AI-powered energy optimisation, behind-the-meter storage, carbon credit origination and managed energy services for complex multi-site consumers. This segment will be developed in parallel with our upstream and generation assets, leveraging the data and operational insight generated across the portfolio.

Digital-First

AI optimisation and real-time energy management

Carbon

Credit origination and ESG-linked managed services

TEILCHEN ENERGIE — INTEGRATED POWER SYSTEM | SINGLE-LINE DIAGRAM REV 01 | TARGET G 250 MW CCGT Gas-to-Power 11 kV → 132 kV G 50 MW EGS GEO Baseload 24/7 11 kV → 132 kV 120 MWp INV SOLAR PV Utility-Scale Array DC/AC → 132 kV 200 MW / 800 MWh SOC 72% PCS BESS Grid-Scale Storage 690 V → 132 kV 132 kV HIGH-VOLTAGE BUSBAR VT AI / SCADA EMS Real-Time Dispatch & Optimisation IEC 61850 · MODBUS · DNP3 132/33 kV 50 MVA 33 kV DISTRIBUTION BUS CT INDUSTRIAL Heavy Offtake ≤ 80 MW CT MUNICIPAL Grid Supply ≤ 40 MW CT CARBON / VPP Export & Credits Grid Export CT DIGITAL Analytics Node PMU · IED · RTU LEGEND — SYMBOL KEY Circuit Breaker (CB) Transformer (TX) Current Transformer (CT) SCADA Comms G Generator Unit Battery Storage (BESS) IEC Load Node TARGET ARCHITECTURE